For decades, the Decent Homes Standard has set the minimum quality benchmark for social housing in England. It established a floor below which no social tenant’s home should fall, covering structural integrity, the absence of serious hazards, the state of repair of fixtures and services, and a minimum level of thermal comfort. The government confirmed on 28 January 2026 that an equivalent framework will apply to private rented homes in England from 2035. Legislation is still to come, with detailed guidance due later in 2026. In the meantime, the existing duties under the Housing Act 2004 and the Homes (Fitness for Human Habitation) Act 2018 continue to apply.
For landlords, understanding what the confirmed standard covers and what a property condition review might reveal is a practical starting point. The government is encouraging landlords to plan early.
What the Decent Homes Standard requires
The new standard has five criteria, all of which must be met.
Criterion A: Free of the most serious hazards. A property must be free of Category 1 hazards under the Housing Health and Safety Rating System (HHSRS). Category 1 hazards represent the most serious risks to health and safety, including significant damp and mould, structural instability, inadequate heating and serious fire risks.
Criterion B: In a reasonable state of repair. This covers the fabric of the building and the condition of key services including plumbing, electrical systems and heating, as well as kitchens and bathrooms among the key components assessed.
Criterion C: Provides core facilities and services. Flats need to meet three of four listed facilities requirements; houses need to meet two of three. Child-resistant window restrictors are required where there is a fall risk.
Criterion D: Provides thermal comfort. The main heating system must be capable of heating the whole home and be programmable by the tenant. The home must also meet the Minimum Energy Efficiency Standards. The government has separately confirmed that privately rented homes in England and Wales must reach EPC band C, or equivalent under new EPC metrics, by 1 October 2030, with a cost cap of £10,000 per property. Planning EPC improvement work and Decent Homes compliance together, rather than as separate programmes, is a practical approach given the overlap between the two requirements.
Criterion E: Free of damp and mould. This criterion sits alongside the broader hazard assessment under criterion A and reflects the government’s sustained focus on damp and mould as a health and safety issue in rented homes.
How enforcement will work
Local councils will enforce the standard in the private rented sector. For criterion A failures, councils have a duty to act. For the other criteria, they have a power to act.
Councils can now issue civil penalties of up to £7,000 for Category 1 hazards, which came into force on 22 June 2026. The maximum fine for not complying with enforcement notices rises from £30,000 to £40,000.
What landlords can do now
A property condition assessment against the five criteria is a useful exercise now, ahead of the 2035 date and the finalisation of detailed guidance. Properties that clearly have no gaps give landlords confidence; those with known issues give them time to plan and finance the necessary work before any enforcement framework is in place.
The most valuable starting point is a thorough property condition review, ideally conducted by a qualified surveyor or property professional who can identify any HHSRS hazards, assess the condition of the fabric and services, and evaluate facilities against the new standard’s requirements. That assessment produces a clear picture of what work is needed and in what order it should be prioritised.
For landlords with larger portfolios, spreading improvement work over the years between now and 2035 is more manageable than addressing everything in the final stages. Prioritising properties with Category 1 hazards or the most significant condition issues first, then working through the remainder systematically, is both financially and practically sensible. Improvement work planned well in advance tends to produce better outcomes in terms of quality and cost than work commissioned under time pressure.
The Decent Homes Standard is a floor, not a ceiling. Landlords who plan ahead are well placed for the regulatory landscape that follows.